High-Rise ResidentialAI-generated concept · not an actual project
Hospitality & Mixed UseAI-generated concept · not an actual project
Condominium CommunitiesAI-generated concept · not an actual project
Planning for West Palm Beach
A new standard for shared spaces.
We can discuss construction for a new amenity, review an aging concrete pool or assess whether a membrane is appropriate for a damaged vessel.
AI-generated image for reference and concept only. Not an actual project.Palm Beach County
How a commercial pool project runs in Palm Beach County.
For West Palm Beach condominiums, hospitality spaces and other shared properties, the first conversation should cover the pool’s current condition, project goals and how the space is used. That context shapes the scope and sequencing.
Who builds it: Commercial Pools Florida is a division of Cool Pool of Florida, LLC, Florida Certified Pool/Spa Contractor CPC1461644. That company signs the contract for commercial pool construction, concrete renovation and pool repair in Palm Beach County. Commercial pool services →
Who permits it: The building permit comes from the building department of the city where the property sits, or from the county for unincorporated Palm Beach County. The Florida Department of Health is involved as well, because a commercial pool is a public pool. Florida commercial pool permits and DOH approval →
Before it opens: A pool at a West Palm Beach condominium, hotel or club needs an operating permit from the Florida Department of Health, and the Department states that the operating permit application comes before the building department issues the construction or modification permit. Florida commercial pool permits and DOH approval →
When the pool is damaged: Where the concrete shell allows it, the repair can use a reinforced PVC pool membrane installed over the existing pool. An on-site evaluation decides; if a membrane does not fit, we say so and explain the other paths. Commercial pool repair and PVC pool membrane →
When a board decides: Section 718.3026, Florida Statutes, sets when a condominium association must obtain competitive bids, and Section 553.899 sets when condominium buildings three habitable stories or more need a milestone inspection. We write the scope so the board can compare it and plan around both. Condo and HOA pool renovation for boards →
Hotels and resorts: Pool work at a West Palm Beach hotel or resort is planned around guests, with clear dates for closing and reopening the pool. Hotel and resort pool renovation →
Where we are: Our West Palm Beach office is at 515 N Flagler Dr, Floor BL, Suite 350, West Palm Beach, FL 33401, phone (561) 725-9214. Contact →
Palm Beach County rules
Permits and inspections in Palm Beach County.
Building permit: Palm Beach County’s PZB Building Division permits work in unincorporated Palm Beach County; inside a city, the city’s building department has jurisdiction. Palm Beach County, PZB Building Division →
Department of Health: The Florida Department of Health in Palm Beach County reviews the plans for each public pool, inspects approved pools at least twice a year, and publishes a pool resurfacing notification form. DOH-Palm Beach, Pools and Spas →
State pool rules: The Florida Department of Health sets sanitation and safety standards for public pools in Chapter 64E-9 of the Florida Administrative Code. Chapter 64E-9, Florida Administrative Code →
Milestone inspections: Under Section 553.899, Florida Statutes (passed in 2022 as SB 4-D), condominium and cooperative buildings three habitable stories or more need a milestone inspection by a Florida-licensed architect or engineer. It covers the building’s major structural components; it is not a pool inspection, and we do not perform it. When it falls in the same window as the pool work, we plan the two together. Section 553.899, Florida Statutes →
Process
From survey to reopening.
Survey: An on-site look at the pool, the deck, access and how the property uses it.
Bid: A written scope the board or owner can compare.
Permit: Building department and Department of Health approvals before work starts; timing depends on the jurisdiction.
Drain and demolition: The pool closes, is drained and the old finish or damaged areas are removed.
Structure and finish: Repairs to the concrete shell, then tile, coping and the new finish; duration depends on what the survey and demolition find.
Health inspection: The Department of Health inspects the work before the pool can operate again.
Reopen: The pool reopens on a date planned with the property.